How Much Is The House Cut
Besides, the customer can come to us on his own if he wants to see his house cut.
The cost of the house or bath is: a cut, a diameter of a rib 24-28 cm, a height of 3 m for houses; 2, 5 m for baths. Potassium and sexual probes (laga) - lafoet 0.15 m.
Additional services:
Construction of a foundation under a wooden cut (value of materials and value).
Complexation of cuts with additional materials.
Subsequent internal and external cut under the key.
Work on the roof of the roof of any material (metalochrypica, ondulin et al. of blood).
Treatment of decoration coatings, aniseptics.
Dimension, m | Hand in hand, shirt | Hand in the cup, shirt | Rubber/scobel handling, shirt, shirt | rubber/cobel handling, shirt, shirt |
cut 5x6 | 112 200 | 132 600 | 25 080 | 29 640 |
cut 5x7 | 122 400 | 142 800 | 27 360 | 31 920 |
cut 5x8 | 140 400 | 162 000 | 34 200 | |
cut 5x9 | 159 600 | 182 400 | 36 480 | |
cut 5x10 | 180 000 | 204 000 | 38 760 | |
cut 6x6 | 122 500 | |||
cut 6x7 | 133 000 | 153 000 | ||
cut 6x8 | 151 000 | 172 800 | ||
cut 6x9 | 171 000 | 193 800 | ||
cut 6x10 | 192 000 | 216 000 | 41 040 | |
Cut 7x7 | 143 000 | 163 200 | ||
Cut 7x8 | 183 600 | |||
Cut 7x9 | 182 000 | 205 200 | ||
Cut 7x10 | 228 000 | 43 320 | ||
Cut 8x8 | 194 400 | |||
Cut 8x9 | 216 600 | |||
Cut 8x10 | 240 000 | |||
cut 9x9 | ||||
cut 9x10 | 252 000 | 47 880 | ||
Cut 10x10 | 264 000 | 45 600 | 50 160 | |
3x3 | 51 000 | 68 000 | 11 400 | 15 200 |
3x4 | 59 500 | 76 500 | 13 300 | 17 100 |
3x5 | 85 000 | 19 000 | ||
3x6 | 93 500 | 20 900 | ||
4x4 | ||||
4x5 | ||||
4x6 | 102 000 | 22 800 | ||
5x5 | ||||
5x6 | 110 500 | 24 700 | ||
Tower 6x6 | 119 000 | 26 600 |