Best Suburban Projects
Planned housing projects Building projects
|
The Russian School of Architectural Design of Country-Based Houses is a very young establishment. That is why the most vivid and gifted architects work in artists and project offices on small-sized houses, cattle and mansion projects. A new project in the country house requires not only fantasy but good taste, a clear vision not only of the paper image of the future home, but also its implementation. At the same time, modern Russian projects of houses and cottages are no longer primitive houses of the beginning of the 1990s, with bricks and concrete in the form of huge and square boxes, not thin bunkers, not the angars. Today ' s projects of the country ' s homes and the cattle of Russian architects are a combination of ease and abundance of the European house with the strength and solidarity of the Russian house. That is why modern Russian projects of houses, botttage and specialties from the best architects of Russia are presented on the PARFENON home-based magazine in the most complete form and diversity.
House projects 1 - 15 of 1806
1 2 3 4 5 end1 2 3 4 5 end
Time for the express delivery of your door-to-door order on Russia | Moscow, St. Petersburg, Orel, Belgorod, Ryazan, Kursk, Nizhny Novgorod, Kazan, Jaroslavl, Kaluga, Ivanovo | 1 day | Kaliningrad, Arkhangelsk, Krasnodar, Rostovna Donu, Astrahan, Volgograd, Samara, Saratov, Catherineburg, Novosibirsk, Omsk, Tomsk, Surgut, Tumen New, Urengoy, Hanty Mensysk, Barnaul, Chelyabinsk, Perm, Krasnoyarsk, | 2 days | Habarovsk, Vladivostok, Irkutsk, Yakutsk, Ulaan Uday | 3 days | Salehard, Nerungri, South Sahalinsk, Abakan, Chita | 4 days | Delivery to CIS countries | 3-5
days |
Recent housing projects |
New House projects |
Monthly project |
Area determination
There are four types of space available for each of the design houses:The area of construction is a space limited to the outside structure of the house at the level of the first floor; this is almost the area represented by the projection of the house on the land improvement project.
The total area is the area of all floors of the house in the outer contour of the walls and all elements outside the site, i.e. terrace, outer staircases, balconys, sealed gallery, access roads to garages, etc.
The net area (semi-) is the floor area of all premises in the light of construction (gross gross less construction). This is practically the area of all sexes to be made during the construction of the house.